Design, delivery, and assembly of the structure
Construction of the roof structure for fertilizer storage walls
Construction of wall-roof frames forming the roof over the retaining walls of the fertilizer storage facility. All connectors must be made of stainless steel or feature a protective coating compliant with C4 class standards.
Design and delivery of the structure
Structure of the glass façade, mezzanine, and roof of the service and sales building
Roofing of the camper sales and service showroom. The project also included the design and delivery of the wooden substructure for the glass façade, HBE mezzanine, and laminated timber stairs.
DESIGN, DELIVERY AND ASSEMBLY OF THE STRUCTURE
Storage hall made of glued laminated timber
Supporting frame consisting of columns and a wooden girder in the shape of a double trapezoid. Walls are covered with sandwich panels, the roof is covered with structural sheet metal with PIR insulation and a roof membrane.
DESIGN, SUPPLY AND SUPERVISION
Social pavilion at the tennis court hall
Wooden structure using timber frame technology and the HBE system. The scope of the order also includes a building foundation design and prefabrication of all structural elements. During the works, we conducted author’s supervision.
DESIGN, DELIVERY AND ASSEMBLY OF THE STRUCTURE
Roof of sport and recreation centre
Geometrically complicated, multi-hipped roof. Main beams made of glued laminated timber, distributed radially. Rafters were installed between the beams. Almost each of the rafters had a different cut geometry. The assembly took 1.5 weeks.