Projects
DESIGN AND SUPPLY
Stage roofing – geodesic dome
Construction is based on Icosahedron dome with dia. 13,0 meter and height 5/9 of sphere. Glulam members are cut and drilled in CNC machines all connected in steel nodes.
DESIGN AND SUPPLY
Glass façade with wooden substructure and arcade gable frame
Timber frame with rigid corners which create building’s arcade of the one-family house and glass façade structure made from prefabricated wooden lattice.
DESIGN AND SUPPLY
Timber shelter on the primary school premises
Two gable frames with rigid corners and a roof rafter system whose load is carried by rectangular stud walls.
DESIGN AND SUPPLY
Roofing for grain storage warehouse
Boomerang roof girder with a span length of 26.6 m with purlins supporting the roof sheathing and stiffeners of lower zone in the form of bracing.
DESIGN AND SUPPLY
Church roof trusses
The glued-laminated timber structure supports traditional rafters. The structure was designed as trusses. All elements were prefabricates by CNC machine.
SUPPLY
Glue laminated arches
Arch elements made of glued laminated timber with a bending radius of 2.46 m.
DESIGN AND DELIVERY OF CONSTRUCTION
The structure of the roof of the banquet hall
Wooden truss girders with a steel tendon. All components are CNC machined. Wood covered with a decorative preparation, steel were galvanized and fireproof painted.
DESIGN, DELIVERY AND ASSEMBLY OF THE STRUCTURE
Storage hall made of glued laminated timber
Supporting frame consisting of columns and a wooden girder in the shape of a double trapezoid. Walls are covered with sandwich panels, the roof is covered with structural sheet metal with PIR insulation and a roof membrane.
DESIGN, SUPPLY AND SUPERVISION
Social pavilion at the tennis court hall
Wooden structure using timber frame technology and the HBE system. The scope of the order also includes a building foundation design and prefabrication of all structural elements. During the works, we conducted author’s supervision.
DESIGN, DELIVERY AND ASSEMBLY OF THE STRUCTURE
Roof of sport and recreation centre
Geometrically complicated, multi-hipped roof. Main beams made of glued laminated timber, distributed radially. Rafters were installed between the beams. Almost each of the rafters had a different cut geometry. The assembly took 1.5 weeks.
DESIGN AND DELIVERY OF CONSTRUCTION
Service building with office space
A two-story hall, the ground floor in the structure of glued laminated timber (BSH) in the form of rigid frames, the first floor in the frame structure.